During the opening of the new DHL hub in Vilvoorde, the installation of several safety gates became necessary. These gates are designed to ensure the safety of personnel using the conveyors. A custom made sticker (printed with our CPM-200 label printer) containing safety instructions was provided.
We also installed stairs at the loading docks to allow operators to disembark safely.